The greenfield facility is having a factory with large spans of 32 m width each – 3 bays. Natural lighting has been provided in the factory by using large windows and continuous strip polycarbonate lighting. The entire loading and unloading operation has been planned towards the rear where trucks are directly loaded using overhead cranes. The canteen and admin block were designed using glass and cement board for external cladding.
SCOPE:
Architectural, Structural, Civil Utilities, Electrical, HVAC, Interior, Contract Management, Site supervision
Savli
Year 2011 – 2012