Siemens turbine factory expansion was a brownfield project under which 3 new bays were planned adjacent to the existing bay. The existing bay was a site fabricated structure while the new bays were planned to be a pre-engineered building which posed many technical challenges. The same were handled successfully by us.The crane capacities in expansion were ranging from 80 ton to 140 ton. The test bay for turbines was designed with closely spaced UR piles and a raft on top of it to achieve 50 ton / sqm of loading.

SCOPE:
Architectural, Structural, Civil Utilities, Contract Management
Baroda:
Year 2009 – 2010